Below are some of our recent projects and our current one!
We began remolding the bathroom just a little over two months ago. We gutted then entire bathroom to make room for new fixtures, plumbling, and electical work. So far we have installed the plumbing lines to the bathtub, sinks, and outflow lines. We have also ran new wire to set up for new lighting and outlets. Soon we are moving towards new mold–resistant drywall and tiling flooring!
Just below the bathroom, we did some minor work on the living room, adding the new drain lines and wiring towards the fusebox. The walls and floor have been stripped and to make way for new carpet and drywall. Not picture just yet is all the new outlet boxes and wiring that will make way for brand new light fixtures and much more!
Next to the bathroom, the bedroom is also in its early stages of renovation. With the space gutted, the newly installed wiring allows for flexible lighting options and the potential for a ceiling fan or mounted fixtures. Plumbing lines from the adjacent bathroom have been coordinated carefully to avoid future issues and maximize space. While the finishes are still to come, this bedroom is on track to become a quiet, comfortable retreat, benefiting from the clean layout and fresh infrastructure already put in place.
Next to the bathroom is the bedroom which is not pictured entirely. However, within the week we will have pictures to share to all of you! The bedroom has also been gutted like the bathroom due to problems with the joists. We will reinforce these with new piece of lumber. Then we are going to wire new outlets and add a new carpet to the floor.